Skip to product information
1 of 1

Ngineer

N Afton Canyon Bridge 2

N Afton Canyon Bridge 2

Regular price €24,26 EUR
Regular price Sale price €24,26 EUR
Sale Sold out
Material
Model of half of a concrete culvert or bridge in N scale. This bridge was modeled after a bridge in Afton Canyon, built in 1928. The culvert has 2 tubes with a concrete dividing wall. The year of construction is inscribed in the front wall (please note: I can not guarantee the numbers will be printed perfectly since they are quite thin, it's most likely to print well in Detail Plastic). The top of the deck is 14mm above 'ground level', for best result the bridge should be placed 2mm in the ground in order for it to blend in optimally. The deck is 35 mm long from the rear of the front wall to the end of the culvert pipe. In order to make a complete culvert you can place two of these end to end, they can be cut if needed (or contact me for a certain length)

​This culvert comes fully assembled, but unpainted.
View full details