Skip to product information
1 of 1

Ngineer

N Afton Canyon Bridge 5

N Afton Canyon Bridge 5

Regular price €30,28 EUR
Regular price Sale price €30,28 EUR
Sale Sold out
Material
Model of a concrete bridge in N scale. This bridge was modeled after a bridge in Afton Canyon, built in 1926. The bridge has a single span that appears to be a retrofit of later date than the abutments. The year of construction and the milepost 194.65 are inscribed in the abutment (please note: I can not guarantee the numbers will be printed perfectly since they are quite thin, they are most likely to print in Detailed Plastic). The top of the deck is 29mm above 'ground level', for best result the bridge should be placed 5-10mm in the ground in order for it to blend in optimally. The deck is 27 mm wide, enough for a single ballasted track.
The deck is hollow with 3 holes in each side, which is necessary for emptying the support material during production. 
This bridge comes fully assembled, but unpainted.
View full details